In a significant development, NHPC achieved a milestone with the successful synchronisation of the 250 MW Unit (Unit-2) of the 2,000 MW Subansiri Lower HE Project (one of eight 250 MW units) with the National Grid.
India’s Largest Hydropower Project Achieves Key Milestone
You May Also Like
Posted in
All
Winaura
Posted by
Samreen Aslam
Posted in
All
Appareil à avec Pharaoh’s hugo bonus de créneaux Aventure pour IGT
Posted by
Samreen Aslam